But, with the days getting longer, the blizzards fewer (but not completely absent!), and the temperatures mostly above freezing, things have begun to pick up again. We need to get this post in today, since hopefully by this time next week, the interior will be insulated and look very different.
The biggest update has been the siding. The house is almost completely covered in siding, with very little pink insulation visible.
View from the top of the driveway |
Back of the garage and north side of the house |
Front entry |
South side of the house |
Piping for the baseboard heaters sprung up like crocus shoots through the snow:
Other than that, not much else has happened that is photo-worthy. We've spent the last few weekends in Portland narrowing our search for tile for the two bathrooms. We have made some progress on that front, but aren't ready to commit yet. Along the same vein, we've been looking at lighting fixtures. Plus, we've been looking at and sitting on couches, and generally thinking about actually living in the house. In the next week, fiberglass insulation will be blown in, followed shortly by installation of the sheet rock. Then things will really feel like they are moving along!
No comments:
Post a Comment